Brackish Reverse Osmosis and Nanofiltration
Cooper City 4 MGD Expansion
Fast Facts [Download Fact Sheet]
- Owner
- Cooper City Utilities
- Engineer
- CH2M HILL
- Application
- Municipal potable water treatment plant
- Equipment
- Complete membrane skid assembly, membranes and local control panels
- Start Up Date
- December 2003
- Operating Data
- Filmtec NF-90 elements
Permeate Flow: 4,000,000 gpd
Recovery: 80% - Scope of
Work/Supply - Design, fabricate, supply, install and commission
Doosan Hydro Technology was contracted by Cooper City to design and fabricate NF skid assemblies to provide additional water at their existing plant. It was very important to the City that the new and old skids look uniform next to one another. Doosan Hydro Technology not only met their expectations but exceeded them by supplying polished stainless steel pipes and matching all skid frame colors. Cooper City and Doosan Hydro Technology are both pleased with the outcome of this project.
“Two complete, 2 MGD skids were sent to site fully assembled. Though achieving this design was challenging, it eliminates all installation errors on site and allows us to control the quality of our product.”