Brackish Reverse Osmosis and Nanofiltration

Southmost Regional Desal Facility

Fast Facts [Download Fact Sheet]

Owner
Brownsville Public Utilities
Engineer
NRS Consulting Engineering
Application
Municipal potable water treatment plant
Equipment
Bulk chemical storage tanks, all chemical dosing systems, high pressure pumps, cartridge filters, RO trains with energy recovery turbines, CIP system, instrumentation, controls, PLC, degasifiers, and all interconnecting pipeworks
Operating Data
Southmost Regional Desal Facility
Feedwater TDS: Average 3,500 mg/L
Permeate TDS: 80 mg/L
Permeate Flow: 6,000,000 gpd
Total w/Blend: 7,500,000 gpd
Recovery: 75 %
Scope of
Work/Supply
Turnkey contract for design, fabrication, supply, assembly, installation, testing and commissioning

“The purpose of the regional facility, is to provide treated brackish water (salty groundwater) for the Southern Cameron County region. This project also provides for an alternative water supply source away from the Rio Grande River for the majority of the SRWA partners.”

Energy recovery turbines were incorporated into the plant design in order to combat a future rise in feed water TDS. The plant will need only minor modifications to the high pressure feed pumps as the water quality degrades and required feed pressure increases.

 