Power Industry & Industrial Processing
Altamira II – 495 MW Combined Cycle Power Plant
Fast Facts [Download Fact Sheet]
- Owner
- Electricidad Aguila de Altamira S. de R.L. de C.V.
- Engineer
- Mitsubishi Heavy Industries, Nagasaki, Japan
- Application
- Treatment of River Water to Produce Boiler Feed Water
- Equipment
- Clarifier, Reverse Osmosis, Mixed Bed Deionization, Oil-Water Separator, Decarbonator, Filter Belt Press
- Start Up Date
- May 2002
- Operating Data
- Demineralized Water: 16ΜΩ-cm
Clarifier Feed Flow: 2,667 gpm
Feedwater TDS: 838 mg/L
RO Permeate: 5 mg/L TDS - Scope of Work
- Process Design and Equipment Layout, Fabrication of Systems, Installation Supervision, Commissioning, Start-up and Owner Training
Facility Summary
The Altamira Combined Cycle Power Plant, an Independent Power Producer (IPP), was delivered on-schedule and achieved better performance than comparable ‘F Generation’ Gas Turbines.
The addition of this highly successful project, featuring the technologically complex ‘F Generation’ Gas Turbine, is truly a new milestone demonstrating the high potential for future activities in this country.