Power Industry & Industrial Processing

Chihuahua Combined Cycle Power Plant 435 MW

Fast Facts [Download Fact Sheet]

Owner
Electricidad Aguila de Altamira S. de R.L. de C.V.
Engineer
Mitsubishi Heavy Industries, Nagasaki, Japan
Application
Zero Liquid Discharge Wastewater Treatment, Boiler Feed, Sewage Treatment
Equipment
ZLD: Two-Stage Lime Softening, Media Filtration, Reverse Osmosis, Evaporator
BFW: Flocculation, Media Filtration, Reverse Osmosis, Degasser, Mixed Bed Deionization
STP: Extended Aeration Package Sewage Treatment
Chihuahua
Operating Data
Feedwater TDS: 10,000 mg/L
RO Permeate: < 150 mg/L TDS
Demineralized Water: 16ΜΩ-cm
Start Up Date
May 2001
Scope of Work
Process Design and Equipment Layout, Fabrication of Systems, Installation Supervision, Commissioning, Start-up and Owner Training

Facility Summary

The facility includes two M501F gas turbine generators installed indoors, which are able to burn natural gas and diesel oil with DLN (Dry Low NOx) combustors. The triple-pressure heat recovery steam generators are of the reheat type with natural circulation designs.The plant is a 2-in-1 configuration with two gas turbines connected to their respective HRSGs, and with the steam from both HRGSs supplied to a steam turbine. An Air Cooled Condenser has been provided as the cooling system of the turbine exhaust steam flow, owing to the insufficient cooling water supply on-site. The gas turbine operations are monitored by MHI in Japan using Remote Monitoring System to ensure proper operation and to maintain a higher availability of units.

 

power-industry - power-project - chihuahua -